mobile secure units
Organisations such as banks, building societies, currency exchanges, rail companies and councils often need to use temporary premises when they embark on a refurbishment programme. The issue of providing temporary accommodation is relatively easy to solve. However, the specific security threats associated with handling cash adds another dimension to the problem.
C3S Security Systems has a fleet of Mobile Secure Units that are constructed and equipped to meet the following customer needs:
• Security to match the perceived threat • A flexible layout to match the anticipated levels of business • A design and fit-out to match the corporate identity
Working closely with a clients at all stages of the design ensures that the client's many and varied aesthetic, operational and security requirements are incorporated to provide a friendly yet secure working environment.
The end result is a mobile unit which projects the right image to the client's customers and equally importantly to its potential customers.
specification guide
Although our MSU's are ready for immediate use, they can be customised to meet individual client's aesthetic and security needs.
security options
The security options available reflect the different security philosophies that different clients adopt to safeguard the well-being of their staff.
The options include: • Glazed Security Screens (Physical or Ballistic Resistant) • Rising Security Screens (Ballistic Attack Resistant) • Security Air-lock System (SAS)
structural & aesthetic options
Standard fixtures, fittings and décor are of an already high standard.
The units' interior and exterior can be designed to reflect a client's corporate image.
With an almost infinite array of internal fixtures and fittings, wall, floor and ceiling finishes, virtually any requirements can be accommodated. Staff facilities can equal those found in permanent branches.
Externally, the mobile secure unit permits similar flexibility of appearance and design. Many different wall finishes, roof options and other external features can be incorporated to meet the client's needs.
installation & commissioning
Units are often available for immediate installation if customisation is not necessary.
If additional work is required, units are usually available within a matter of 4 to 5 weeks from agreement of all design details with the client.
The MSU takes between 24 and 48 hours on site to be made operational. Preparatory work for the provision of utilities will be organised before delivery so that the actual installation will take place usually within this period of time. |